Development Log

Development Log

Updates

★ Latest Version

V2 — Design Basis & Architecture

The project was restarted as a second design iteration so that major dimensions and component choices are driven by engineering analysis rather than geometry alone. The current phase establishes the design basis, engine architecture, operating assumptions, and calculation workflow before hardware is manufactured.

Project Restart — V2

Reframed the project around a calculation-driven design process, modular hardware, and documented engineering decisions.

V1 — Proof of Concept

The first version established the basic architecture and demonstrated what needed to be improved before committing to a more rigorous build.